{"id":51749,"date":"2019-07-31T17:07:00","date_gmt":"2019-07-31T17:07:00","guid":{"rendered":"https:\/\/energi.media\/?p=51749"},"modified":"2019-07-31T17:07:00","modified_gmt":"2019-07-31T17:07:00","slug":"texas-first-in-us-installed-wind-capacity-number-of-turbines","status":"publish","type":"post","link":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/","title":{"rendered":"Texas first in US-installed wind capacity, number of turbines"},"content":{"rendered":"<p><em><strong>By Abagail Anderson, Richard Bowers<\/strong><\/em><\/p>\n<p><em>This article was published by the <a href=\"https:\/\/www.eia.gov\/todayinenergy\/detail.php?id=40252\" target=\"_blank\" rel=\"noopener noreferrer\">United States Energy Information Administration<\/a> on July 31, 2019.<\/em><\/p>\n<p>As of the beginning of 2019, 41 states had at least one installed wind turbine. Of these 41 states, Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).<\/p>\n<figure style=\"width: 588px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.eia.gov\/todayinenergy\/images\/2019.07.31\/main.svg\" alt=\"summer capacity and number of tubines\" width=\"588\" height=\"276\" border=\"0\" \/><figcaption class=\"wp-caption-text\"><em><strong>Source:\u00a0<\/strong>U.S. Energy Information Administration,\u00a0<a href=\"https:\/\/www.eia.gov\/electricity\/data\/eia860\/\" target=\"_blank\" rel=\"noopener noreferrer\">Annual Electric Generator Inventory<\/a><\/em><\/figcaption><\/figure>\n<div class=\"source\"><\/div>\n<p>As wind technology has advanced, turbines have grown larger in the United States, and the capacity of individual turbines has increased with size.<\/p>\n<p>States where wind adoption occurred early, such as California, have a high number of turbines relative to their wind generation capacity compared with states where wind was adopted later, such as Texas, Iowa, Oklahoma, Kansas, and Illinois.<\/p>\n<figure style=\"width: 586px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.eia.gov\/todayinenergy\/images\/2019.07.31\/chart2.svg\" alt=\"wind turbines by year of construction\" width=\"586\" height=\"417\" border=\"0\" \/><figcaption class=\"wp-caption-text\"><em><strong>Source:\u00a0<\/strong>U.S. Energy Information Administration,\u00a0<a href=\"https:\/\/www.eia.gov\/electricity\/data\/eia860\/\" target=\"_blank\" rel=\"noopener noreferrer\">Annual Electric Generator Inventory<\/a><\/em><\/figcaption><\/figure>\n<div class=\"source\"><\/div>\n<p>Based on data in the U.S. Energy Information Administration\u2019s <a href=\"https:\/\/www.eia.gov\/electricity\/data\/eia860\/\"><em>Annual Electric Generator Inventory<\/em><\/a>, the earliest U.S. wind turbines still operating were installed in California in July 1975.<\/p>\n<p>Despite having the second most installed wind turbines, California accounts for only 6.1 GW of total installed capacity, fourth among the states. In 2018, California reduced its number of turbines but still increased its wind capacity by repowering some turbines to improve their efficiency.<\/p>\n<figure style=\"width: 575px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.eia.gov\/todayinenergy\/images\/2019.07.31\/chart3.png\" alt=\"capacity-weighted age of operable wind installations\" width=\"575\" height=\"287\" border=\"0\" \/><figcaption class=\"wp-caption-text\"><em><strong>Source:\u00a0<\/strong>U.S. Energy Information Administration,\u00a0<a href=\"https:\/\/www.eia.gov\/electricity\/data\/eia860\/\" target=\"_blank\" rel=\"noopener noreferrer\">Annual Electric Generator Inventory<\/a><\/em><\/figcaption><\/figure>\n<div class=\"source\"><\/div>\n<p>Although California has the oldest operable turbine (44 years), Tennessee has, on average, the oldest operating wind turbines, with an average project age of 17 years. California, Wyoming, Minnesota, and Arkansas round out the top five states in terms of oldest project ages, from an average 16 years old in California to an average 12 years old in Arkansas.<\/p>\n<p>Wind turbine hub heights have\u00a0<a href=\"https:\/\/emp.lbl.gov\/sites\/all\/files\/scaling_turbines.pdf\">increased over time<\/a>\u00a0because turbine blades have gotten longer. Turbines with longer blades and a greater rotor diameter typically have higher nameplate capacity. Older turbines, such as those in California or Tennessee, generally are shorter and have shorter blades than newer turbines, which have higher hub heights to accommodate longer blades.<\/p>\n<figure style=\"width: 588px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.eia.gov\/todayinenergy\/images\/2019.07.31\/chart4.svg\" alt=\"wind turbine heights, select states\" width=\"588\" height=\"276\" border=\"0\" \/><figcaption class=\"wp-caption-text\"><em><strong>Source:\u00a0<\/strong>U.S. Energy Information Administration,\u00a0<a href=\"https:\/\/www.eia.gov\/electricity\/data\/eia860\/\" target=\"_blank\" rel=\"noopener noreferrer\">Annual Electric Generator Inventory<\/a><\/em><\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>By Abagail Anderson, Richard Bowers This article was published by the United States Energy Information Administration on July 31, 2019. As of the beginning of 2019, 41 states had at least one installed wind turbine. <a class=\"mh-excerpt-more\" href=\"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/\" title=\"Texas first in US-installed wind capacity, number of turbines\">[Read more]<\/a><\/p>\n<\/div>","protected":false},"author":6,"featured_media":51750,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"give_campaign_id":0,"footnotes":""},"categories":[1],"tags":[891,14,517,17,890,111],"class_list":{"0":"post-51749","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-news","8":"tag-eia","9":"tag-featured","10":"tag-renewables","11":"tag-texas","12":"tag-usa","13":"tag-wind-energy"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Texas first in wind capacity and number of turbines - Thoughtful Journalism About Energy&#039;s Future<\/title>\n<meta name=\"description\" content=\"Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Texas first in wind capacity and number of turbines - Thoughtful Journalism About Energy&#039;s Future\" \/>\n<meta property=\"og:description\" content=\"Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/\" \/>\n<meta property=\"og:site_name\" content=\"Thoughtful Journalism About Energy&#039;s Future\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/energimedia\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-31T17:07:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energi.media\/wp-content\/uploads\/2019\/07\/wind-capacity.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1207\" \/>\n\t<meta property=\"og:image:height\" content=\"705\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Energi Staff\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@EnergiMedia\" \/>\n<meta name=\"twitter:site\" content=\"@EnergiMedia\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Energi Staff\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/\"},\"author\":{\"name\":\"Energi Staff\",\"@id\":\"https:\\\/\\\/energi.media\\\/#\\\/schema\\\/person\\\/07051d0cfb14da284c97fb8ff214caf7\"},\"headline\":\"Texas first in US-installed wind capacity, number of turbines\",\"datePublished\":\"2019-07-31T17:07:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/\"},\"wordCount\":369,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/energi.media\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energi.media\\\/wp-content\\\/uploads\\\/2019\\\/07\\\/wind-capacity.png\",\"keywords\":[\"EIA\",\"featured\",\"renewables\",\"Texas\",\"USA\",\"Wind Energy\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/\",\"url\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/\",\"name\":\"Texas first in wind capacity and number of turbines - Thoughtful Journalism About Energy&#039;s Future\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energi.media\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energi.media\\\/wp-content\\\/uploads\\\/2019\\\/07\\\/wind-capacity.png\",\"datePublished\":\"2019-07-31T17:07:00+00:00\",\"description\":\"Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).\u00a0\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energi.media\\\/wp-content\\\/uploads\\\/2019\\\/07\\\/wind-capacity.png\",\"contentUrl\":\"https:\\\/\\\/energi.media\\\/wp-content\\\/uploads\\\/2019\\\/07\\\/wind-capacity.png\",\"width\":1207,\"height\":705,\"caption\":\"In 2018, California reduced its number of turbines but still increased its wind capacity by repowering some turbines to improve their efficiency. DesertSun.com photo.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energi.media\\\/news\\\/texas-first-in-us-installed-wind-capacity-number-of-turbines\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energi.media\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Texas first in US-installed wind capacity, number of turbines\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energi.media\\\/#website\",\"url\":\"https:\\\/\\\/energi.media\\\/\",\"name\":\"Thoughtful Journalism About Energy&#039;s Future\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/energi.media\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energi.media\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/energi.media\\\/#organization\",\"name\":\"Energi Media\",\"url\":\"https:\\\/\\\/energi.media\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energi.media\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/energi.media\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/cropped-cropped-EnergiMedia-v3-logo-e1625024297484.png\",\"contentUrl\":\"https:\\\/\\\/energi.media\\\/wp-content\\\/uploads\\\/2021\\\/06\\\/cropped-cropped-EnergiMedia-v3-logo-e1625024297484.png\",\"width\":302,\"height\":61,\"caption\":\"Energi Media\"},\"image\":{\"@id\":\"https:\\\/\\\/energi.media\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/energimedia\",\"https:\\\/\\\/x.com\\\/EnergiMedia\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/energi-media\",\"https:\\\/\\\/www.youtube.com\\\/@EnergiMedia\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energi.media\\\/#\\\/schema\\\/person\\\/07051d0cfb14da284c97fb8ff214caf7\",\"name\":\"Energi Staff\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aab8747a56101912653d395e4d5b76c013eb58c9c0d846ee34f94382c2a3bbb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aab8747a56101912653d395e4d5b76c013eb58c9c0d846ee34f94382c2a3bbb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8aab8747a56101912653d395e4d5b76c013eb58c9c0d846ee34f94382c2a3bbb?s=96&d=mm&r=g\",\"caption\":\"Energi Staff\"},\"url\":\"https:\\\/\\\/energi.media\\\/author\\\/aen-staff\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Texas first in wind capacity and number of turbines - Thoughtful Journalism About Energy&#039;s Future","description":"Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/","og_locale":"en_US","og_type":"article","og_title":"Texas first in wind capacity and number of turbines - Thoughtful Journalism About Energy&#039;s Future","og_description":"Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).\u00a0","og_url":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/","og_site_name":"Thoughtful Journalism About Energy&#039;s Future","article_publisher":"https:\/\/www.facebook.com\/energimedia","article_published_time":"2019-07-31T17:07:00+00:00","og_image":[{"width":1207,"height":705,"url":"https:\/\/energi.media\/wp-content\/uploads\/2019\/07\/wind-capacity.png","type":"image\/png"}],"author":"Energi Staff","twitter_card":"summary_large_image","twitter_creator":"@EnergiMedia","twitter_site":"@EnergiMedia","twitter_misc":{"Written by":"Energi Staff","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#article","isPartOf":{"@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/"},"author":{"name":"Energi Staff","@id":"https:\/\/energi.media\/#\/schema\/person\/07051d0cfb14da284c97fb8ff214caf7"},"headline":"Texas first in US-installed wind capacity, number of turbines","datePublished":"2019-07-31T17:07:00+00:00","mainEntityOfPage":{"@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/"},"wordCount":369,"commentCount":0,"publisher":{"@id":"https:\/\/energi.media\/#organization"},"image":{"@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#primaryimage"},"thumbnailUrl":"https:\/\/energi.media\/wp-content\/uploads\/2019\/07\/wind-capacity.png","keywords":["EIA","featured","renewables","Texas","USA","Wind Energy"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/","url":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/","name":"Texas first in wind capacity and number of turbines - Thoughtful Journalism About Energy&#039;s Future","isPartOf":{"@id":"https:\/\/energi.media\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#primaryimage"},"image":{"@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#primaryimage"},"thumbnailUrl":"https:\/\/energi.media\/wp-content\/uploads\/2019\/07\/wind-capacity.png","datePublished":"2019-07-31T17:07:00+00:00","description":"Texas had the largest number of turbines, with more than 13,000, and the most installed wind capacity, at 24.2 gigawatts (GW).\u00a0","breadcrumb":{"@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#primaryimage","url":"https:\/\/energi.media\/wp-content\/uploads\/2019\/07\/wind-capacity.png","contentUrl":"https:\/\/energi.media\/wp-content\/uploads\/2019\/07\/wind-capacity.png","width":1207,"height":705,"caption":"In 2018, California reduced its number of turbines but still increased its wind capacity by repowering some turbines to improve their efficiency. DesertSun.com photo."},{"@type":"BreadcrumbList","@id":"https:\/\/energi.media\/news\/texas-first-in-us-installed-wind-capacity-number-of-turbines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energi.media\/"},{"@type":"ListItem","position":2,"name":"Texas first in US-installed wind capacity, number of turbines"}]},{"@type":"WebSite","@id":"https:\/\/energi.media\/#website","url":"https:\/\/energi.media\/","name":"Thoughtful Journalism About Energy&#039;s Future","description":"","publisher":{"@id":"https:\/\/energi.media\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energi.media\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/energi.media\/#organization","name":"Energi Media","url":"https:\/\/energi.media\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energi.media\/#\/schema\/logo\/image\/","url":"https:\/\/energi.media\/wp-content\/uploads\/2021\/06\/cropped-cropped-EnergiMedia-v3-logo-e1625024297484.png","contentUrl":"https:\/\/energi.media\/wp-content\/uploads\/2021\/06\/cropped-cropped-EnergiMedia-v3-logo-e1625024297484.png","width":302,"height":61,"caption":"Energi Media"},"image":{"@id":"https:\/\/energi.media\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/energimedia","https:\/\/x.com\/EnergiMedia","https:\/\/www.linkedin.com\/company\/energi-media","https:\/\/www.youtube.com\/@EnergiMedia"]},{"@type":"Person","@id":"https:\/\/energi.media\/#\/schema\/person\/07051d0cfb14da284c97fb8ff214caf7","name":"Energi Staff","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8aab8747a56101912653d395e4d5b76c013eb58c9c0d846ee34f94382c2a3bbb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8aab8747a56101912653d395e4d5b76c013eb58c9c0d846ee34f94382c2a3bbb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8aab8747a56101912653d395e4d5b76c013eb58c9c0d846ee34f94382c2a3bbb?s=96&d=mm&r=g","caption":"Energi Staff"},"url":"https:\/\/energi.media\/author\/aen-staff\/"}]}},"_links":{"self":[{"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/posts\/51749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/comments?post=51749"}],"version-history":[{"count":1,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/posts\/51749\/revisions"}],"predecessor-version":[{"id":51751,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/posts\/51749\/revisions\/51751"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/media\/51750"}],"wp:attachment":[{"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/media?parent=51749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/categories?post=51749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energi.media\/wp-json\/wp\/v2\/tags?post=51749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}